At Marske Methodist Hall, ECYH replaced guttering and downpipes. Some pointing between the bricks was also requested
Another part of the contract with Marske Methodist Hall was to replace the coping stones around the flower beds
Outside Marske Methodist Hall is a box containing their utilities. This box was constructed of brick and had seen better days. ECYH rendered the structure, securing it for the future and making it more cosmetically pleasing.
Author: Karen Higgins
Author: Karen Higgins